[alf-dev] POC Changes/Extensions
|
Hello Fellow ALFers,
Segue has reviewed the POC Use Case docs and proposes the following
extensions/additions:
Build Complete Event
======================
Re: POC Application Requirements Use Blueprint, p.4, AWS2
Re: ALF Use Cases: Process & Service Flows, p.4-5
The ALF common vocabulary should be extended to include product, version,
build, and a test type enumeration (e.g., Full, Regression, Load,
Smoke, NULL). This vocabulary is already shared by several ALM tools.
Allowing use of this vocabulary to be optional has a big disadvantage: it
throws the burden upon the tools to do an internal mapping, an onerous
point-to-point type integration task.
The composite of Product, Version, Build, and Test Types uniquely
identifies the tests the Test Management System will execute and the
binding to scheduling, locations, etc. Deployment and source locations
are not needed. The ExtendedData for the Build Complete event must include
at the minimum Product, Version, Build, and TestType elements of the form:
<ExtendedData>
<Data Name=Product>ALF Designer Product</Data>
<Data Name=Version>1.0</Data>
<Data Name=Build>1451</Data>
<Data Name=TestType>Smoke</Data>
[...]
</ExtendedData>
Test Build Service Flow
========================
Re: ALF Use Cases: Process & Service Flows, p.5 & 9.
There is no need to add test results at the BPEL level to the Test Manager
tool after the Test Service executes. This process is taken care of
internally
by the Test Management tool. The service flow does not need to be aware
or concern itself with how the results are stored in a common repository.
Scan Code Service Flow
=======================
Re: ALF Use Cases: Process & Service Flows, p.8
The flow shows a BPEL operation of Add Scan Findings to Test Management.
Segue proposes that this be done through an interface to the Test
Management
service that it will provide. The input arguments would be:
* Product
* Version
* Build
* Test Definition with Success Metrics Array
* Attachments (e.g., links and files).
The success metrics would be raw data. For a security scan example, time
values would be given as the metric for patch latency or integers as the
metric for SANS/FBI Top 20 compliance. Success criteria for these raw
success metrics should be defined within the Test Management System.
Futhermore, the Test Manager should expose these metrics categorized as
passed/failed according to the criteria as well as their statistical
evaluations based upon the test definitions.
Segue will provide this interface in its submitted WSDL.
Test Build Complete Event
=====================
Re: POC Application Requirements Use Blueprint, p.2, AEB13
Segue proposes that the Event Manager handle Test Build Complete events.
In addition to the standard header, the event would contain ExtendedData
describing the number of tests passed, failed, and unable to be executed.
The ExtendedData would be of the form:
<ExtendedData>
<Data Name=Product>ALF Designer Product</Data>
<Data Name=Version>1.0</Data>
<Data Name=Build>1451</Data>
<Data Name=TestType>Smoke</Data>
<Data Name=NumTestsPassed>12</Data>
<Data Name=NumTestsFailed>3</Data>
<Data Name=NumTestsUnableExe>1</Data>
[...]
</ExtendedData>
Thanks,
Bob