BPMN modeler sub-project proposal first draft is available
Consult the bug 240335 and unzip the attachment to read the first draft of the proposal of the BPMN modeler to go from the status of component to sub-project.
Our main goals for the 1.1 release so far are:
- Implement quick fixes: we have added validation to our diagrams, now we want people to be able to right-click and fix the problem they encounter.
- Add an export tool a la Eclipse Spaces. Be able to deploy a diagram as a zip file, associated with an image and a description.
- Package the BPMN modeler as part of a modeling practitioners Eclipse Product (see bug 240141)
Feel free to comment on the bug!
Posted September 5th, 2008 by Antoine Toulme in category: Business Process
You can leave a response, or trackback from your own site.
Leave a Reply
You must be logged in using your Eclipse Bugzilla account to post a comment.


